Canberra Data Centre (CDC)
Design, supply, install and commission as a turnkey operation 4 x 2250KVA Cummins diesel generators operating in two groups of two, complete with all equipment required for their operation including, sound attenuated housings, exhaust systems, fuel storage and handling, auxiliary DBs, electrical protection air circuit breakers, synchronizing controls, mimic panels, cabling and monitoring signals for transmission to the site DCMS system.
Project included:
- 4 x 2250KVA Cummins diesel generators
- Sound attenuated housing
- Synchronizing controls
- Bulk fuel facilities
Details
Client: Canberra Data Centre
Year: 2014-2015
Location: Hume, ACT