Canberra Data Centre (CDC)
Installation of 2 1400kva generators to provide emergency back up power for the new Stage 3 installation at CDC where a consistent and uninterrupted power supply is critical. Given our significant experience in the Data sector, Kenshaw was also selected to provide 3 additional Cummins generators for both Stage 2 and Stage 3 of the CDC installation. This project has now been completed with Stage 3 completed in early 2013.
Project included:
- 2 x 1400kva Cummins Generators
- Silenced dual width canopy 65db @ 7M
- Synchronisation package
- Bulk fuel facilities
Details
Client: Canberra Data Centre
Year: 2011-2012
Location: Hume, ACT